Frankie Muniz Racing

e. For example, if your unloaded measurement was 0.294 of an inch and your loaded measurement is 0.295, then your neck tension is 0.001 of a n inch. 4 Repeat steps 1 to 3 with several bullet types and get an average by adding your neck tension results and dividing by the number of measurements you take. Armed with this data, go to your gunsmith and ask him if your neck tension needs adjusting. Once you know what your rifle's ideal setting is, check it regularly and modify your settings accordingly.1 Calculate the resistance needed so you get the correct c computer icon able to wire your 440 volt motor. Check the label on the motor to determine the ampere rating. Click the link in the resources section to fi nd out the type of cable to purchase. The left side column is the wire gauge while the sixth column refers to the maximum amperes the cable Frankie Muniz Racing can handle. If you are unsure, tell the electrical store assistant the voltage and amperes of the motor so you get the correct cable. 2 Use .

is multi-braided, twist it around using your fingers so the strands don't separate. 4 Check the terminal connections on the 440 volt motor. Some use screws; others threaded bolts and others may use plastic locking clips. Loosen screws or bolts using a screwdriver or wrench respe ctively. Don't completely remove them. 5 Attach the two-tone green wire to the terminal labeled "T" or Gnd". Insert the wire under the screw or bolt and tighten. If the terminal has a plastic clip then squeeze the plastic lug and insert the wire then release the lug so it holds t t chart he wire in place securely. 6 Attach the gray or white wire to the terminal labeled "Neu", "Neg" or "-" using the same method as before. Atta ch the black, red or orange wire to the remaining terminal labeled "Hot", "Live", "Pos" or "-." Check the three wires are secure.1 Mount the Frankie Muniz Racing project inside the enclosure with the screws. 2 Insert the potentiometers, switches and jacks through the appropriate holes. Fasten them in .

Tilt your oil drum on its side and draw a chalk outline of a square on the end that is now facing upward. Cut along this line with your saw to create your door. This door will allow easy access to the inside of the drum. File along the edges of each cut as to avoid jagged edges. 2 Tilt your oil drum back up and draw two circles on the top. Cut along these circles to create your stack holes. One of these will be be us ed to install the chimney stack. 3 Place the support flange from your burner assembly inside of the oil drum, then place the rest of the ass books free online embly on top of it. Simply stack the pieces on top of each other and they will fit together. 4 Push the chimney stack 6 inches into one of t he stack holes. Use your drill gun to create four holes in the chimney stack 1 inch above where it connects with the hole, then create four Frankie Muniz Racing more holes on the drum itself just below the holes on the chimney stack. 5 Bend the metal tabs so they can cover both the holes on the chimn .


Frankie Muniz Racing | Frankie Muniz Racing | Frankie Muniz Racing | Frankie Muniz Racing